Skip to main content

Office Specialist

Evacuation plans for office buildings and tertiary

From multi-floor headquarters to coworking spaces and business centers, generate evacuation plans compliant with the French Labor Code (article R. 4227-37), ERP type W and NF X 08-070 in just minutes. Import your architect plans as a background layer and trace them with automatic snapping, 250+ pictograms including ISO 7010, high-resolution PDF export.

Last updated:

Labor Code R. 4227-37
ERP type W
ISO 23601 / NF X 08-070
Background-layer import

Why an evacuation plan is mandatory in office buildings

Every office building falls under both the French Labor Code (article R. 4227-37 et seq.) and, when open to the public, the ERP fire-safety regulation — most often type W (administrations, banks, public-facing offices). In both cases, the employer or operator must post legible evacuation plans on each floor and near every exit.

An evacuation plan compliant with NF X 08-070 (fire-incident instructions) using ISO 7010 pictograms must therefore be displayed in circulation areas, updated after every reshuffle and accompanied by general fire-safety instructions. ISO 23601 governs evacuation and intervention plans for complex buildings.

Beyond the legal requirement, the evacuation plan plays a key role during the periodic evacuation drills imposed by article R. 4227-39 of the Labor Code (at least every six months) and during inspections by the safety commission for ERPs subject to authorization.

Tertiary specifics: multi-floor, open-spaces, flex-office

Modern office buildings raise particular challenges: duplicated floors with varying partitioning, closed meeting rooms, coworking spaces shared between several companies, or flex-office layouts where workstations change weekly. The evacuation plan must reflect the actual configuration, locate emergency exits, enclosed staircases, lifts (not to be used), fire hose reels, extinguishers, manual call points and outdoor assembly areas.

In high-rise buildings (IGH) and multi-tenant buildings, several sets of plans may coexist: an evacuation plan per level for occupants and a global intervention plan for the emergency services. Fabrik handles this multi-floor, multi-building logic from a single workspace, and one document can hold several floors.

Clients, sites, buildings and plans: your whole estate in one place.

Fast updates after every reshuffle

In offices, layouts evolve quickly: a new partition, a relocated meeting room, a new floor opening. With an online editor like Fabrik, you update the plan in minutes, regenerate the high-resolution PDF and replace the printouts — no more bureau d'études, no more multi-week wait.

PDF exports rendered at up to 300 dpi stay legible at every printing size (A4 to A0), and the version history lets the employer prove their information duty has been met after every site change.

The editor's drawing tools: walls, doors and windows, with dimensions and snapping.

Labor Code + ERP type W compliance

Plans compliant with articles R. 4227-37 et seq. of the French Labor Code and the ERP fire-safety regulation (type W when public is admitted), with general fire-safety instructions per NF X 08-070.

Multi-floor and multi-building plans

Manage one headquarters, several floors and several sites from the same workspace, with floor duplication, global change propagation and ISO 23601 intervention plans for emergency services.

Accessible routes and assembly areas

Mark accessible routes for people with reduced mobility, safe waiting areas (EAS) and outdoor assembly points, in line with accessibility requirements.
Layout, pre-export check and a PDF ready to display.

Frequently asked questions

Is an evacuation plan mandatory in every office building?

Yes. Article R. 4227-37 of the French Labor Code requires an evacuation plan and fire-safety instructions in every workplace. If the building also receives public (banks, administrations, customer-facing offices), it is additionally classified as ERP — most often type W — and subject to the matching fire-safety regulation.

How often should office evacuation plans be updated?

After every significant layout change (partitioning, exit relocation, change of activity zone) and at minimum before every six-monthly evacuation drill required by article R. 4227-39 of the Labor Code. With an online editor, updates take minutes instead of weeks.

What is the difference between an evacuation plan and an intervention plan?

The evacuation plan, defined by NF X 08-070, is intended for occupants and shows the route to take and the assembly point. The intervention plan, defined by ISO 23601, is intended for emergency services to quickly locate utility shut-offs (gas, electricity), fire hose reels, dry risers and access points. Major office buildings usually have both.

Can I create plans for multiple floors?

Yes. Fabrik handles multi-floor buildings: each floor has its own detailed evacuation plan, several floors can be combined in one exported document, and the intervention plan for emergency services is made in the same tool.

Can a coworking space use a single plan for several companies?

Yes: one evacuation plan per floor is enough, provided it accurately reflects the layout and is posted at every exit and circulation area. Fire-safety instructions are shared; identifying companies by zone remains a best practice to facilitate headcount after evacuation.

Do Fabrik plans meet safety commission requirements?

Fabrik is built around ISO 23601, NF X 08-070, ISO 7010 and the decree of 25 June 1980 as amended for ERPs. The safety pictograms in the library follow ISO 7010, and an automatic check before export verifies exits, indicative travel distances, door widths and pictogram size. Compliance remains the operator's responsibility, and final approval rests with your safety commission.

Create my office evacuation plan⚡ Free, no credit card

No credit card required • Full editor free

Ready to create your office evacuation plan?

Start for free

French Labor Code, ERP type W and ISO 7010 compliant in minutes

Guidance on this site is based on French fire-safety regulations (Code du travail, ISO 7010, ISO 23601, NF X08-070). For US, UK or other jurisdictions, contact our team.

Your cookie choices

A statistical audience measurement runs without your permission; “Reject all” stops it too. Optional cookies extend it and identify where registrations come from. Cookie policy.