Skip to main content

Public roadmap

What is coming to Fabrik

What we are building now and what comes next, with no promised dates. As soon as a feature ships, it moves to the changelog.

Recently shipped

4

Highlights from the changelog.

AI import is back in beta, with processing that starts as soon as you upload

October 2026

New pricing and the “One building” offer

October 2026

Mandatory pictogram suggestions

October 2026

A redesigned way into Fabrik, from sign-up to your first wall

October 2026

The full changelog

In progress

2

In development or in testing.

In testing

Light, dark or system theme

Choose how the whole interface looks in Settings › Appearance. The printed sheet stays white whatever the theme.

  • Light, dark, or following your device
  • Setting kept per device: office desk and field tablet
Beta

An ever more faithful AI import

AI import has reopened in beta on our own model. We improve it with anonymized plans; you can opt out of yours being used, from your settings.

  • Walls, doors and rooms better recognized
  • Fewer fixes after import

Next

2

The next step, once the rest has shipped.

Planned

Fabrik in English

The app is in French today. We are translating it for teams in countries that use ISO 7010.

  • App interface in English
  • US Letter and Tabloid formats, already available
Planned

Field app for technicians

For maintenance technicians: open the plan on site, tap a piece of equipment to see its record, and report what no longer matches.

  • Plan viewable on mobile, floor by floor
  • Moved, missing or removed equipment reported from the site
  • Reports handled from Fabrik's Maintenance

Exploring

1

We are looking into it, nothing is decided.

Research

Plans for US practice

Feet and inches, NFPA 170 symbols and local rules: what it would take for a plan that matches US habits.

  • Imperial units for display and input
  • NFPA 170 symbol library

An idea, something missing?

Your feedback sets the order of this board. Write to us: we answer every message.

Suggest an idea

Try Fabrik today

Create my account

Your feedback shapes the roadmap. Tell us what you are missing.

Guidance on this site is based on French fire-safety regulations (Code du travail, ISO 7010, ISO 23601, NF X08-070). For US, UK or other jurisdictions, contact our team.

Your cookie choices

A statistical audience measurement runs without your permission; “Reject all” stops it too. Optional cookies extend it and identify where registrations come from. Cookie policy.