Complete fire safety plan
Fire safety plan software
Create all your fire safety documents: evacuation plans, intervention plans, fire safety system (SSI) layout plans and general instructions. Compliant with ISO 23601, NF X08-070 and APSAD R4. Full editor free, no credit card, no time limit.
No card required • Full editor free
Fire safety plan: more than just an evacuation plan
Evacuation plan
Fire intervention plan
General fire safety instructions
Fire safety system (SSI) layout plans
Everything you need to create your plans
AI plan import
ISO 7010 compliant
Fast and intuitive
Why Fabrik over AutoCAD, Word or Canva?
| Criterion | Fabrik | AutoCAD | Word / PowerPoint | Canva |
|---|---|---|---|---|
| Time to create a plan | 15 min | 3-5 h | 2-4 h | 1-2 h |
| ISO 7010 compliant | Manual | |||
| 250+ standardized pictograms | ||||
| Background-layer plan import | ||||
| Entry price | €19.99 once per building | $250+/month | Free* | $13/month |
| Learning curve | None | Very steep | Moderate | Low |
| High-resolution PDF export | Basic | Basic | ||
| Team work with roles | License | Cloud | ||
| Built-in ERP library |
* Word and PowerPoint are "free" but not regulatory-compliant, making them unusable in practice for an ERP.
Create your evacuation plan based on your ERP type
Restaurants and bars
Hotels and accommodations
Stores and shopping centers
Educational institutions
Offices and administrations
Industrial sites and warehouses
Standards built in: the references we follow
ISO 7010
Standardized safety pictograms — colors, shapes and graphic symbols for safety signs.
ISO 23601
Safety identification — specifications for evacuation and rescue plans intended for public use.
NF X08-070
French standard — evacuation and intervention plans. Reference for ERP safety commissions.
Labor Code
Article R4227-39 — employer obligations regarding the display of evacuation plans in workplaces.
Decree of 25 June 1980
General ERP safety regulation — provisions applicable to all public-access establishments.
Why is the fire safety plan a critical issue?
263,800
fires handled by French firefighters in 2023, including thousands in commercial premises.
Source : DGSCGC — SDIS Statistics 2024 (Ministry of the Interior)
70%
of businesses hit by a major fire never durably resume their activity.
Source : INRS — "Fire in the workplace" dossier (ED 990)
R4227-38
French Labour Code — evacuation and intervention plan mandatory from 5 employees, posted on every floor.
Source : Légifrance — Labour Code, articles R4227-37 and R4227-38
How it works in 3 steps
- 1
Import your plan
Import your existing plan (PDF or image, photos included): the AI detects walls, doors and windows, then you review and correct the result. A DXF or a sketch goes in as a background layer that you trace with automatic snapping. - 2
Place your safety elements
Add ISO 7010 pictograms, evacuation routes, fire extinguishers and assembly points from the built-in library. - 3
Export a compliant PDF
Download your plan in high-resolution PDF, ready for printing and the safety commission. A4 to A0, portrait or landscape.
Who is Fabrik for?
ERP managers
Fire safety companies
Architects and engineering firms
Facility managers
Prevention consultants
Frequently asked questions
Is Fabrik really free?
Yes. The full editor (walls, ISO 7010 pictograms, every tool) is free, with no credit card and no time limit: 1 plan in storage, on-screen preview with a Fabrik watermark, no download. To deliver, pay €19.99 once for unlimited exports of one building, or subscribe for €49.99/month (unlimited buildings).
Are the plans compliant with ISO 7010 and NF X08-070?
Fabrik includes 250+ pictograms, including the official ISO 7010 signs, and builds in the requirements of NF X08-070 (safety plans) and ISO 23601 (evacuation plans). Before each export, an automatic check covers exits, indicative distances, door widths and sign sizes. PDF exports are ready to present to your safety commission, which alone decides on approval; final compliance remains the responsibility of the building operator.
Is Fabrik suitable for 5th category ERPs?
Yes, Fabrik is particularly well suited for 5th category ERPs (fewer than 300 people). The software directly incorporates the specific requirements: simplified evacuation plan, fire safety instructions, mandatory display.
Can I create plans for a restaurant, hotel or store?
Yes, Fabrik covers all 16 ERP types: type M (stores), N (restaurants), O (hotels), L (theaters), R (schools), W (offices), U (healthcare), etc. Pre-configured templates are available for each type.
What's the difference between Fabrik and AutoCAD?
AutoCAD is a general-purpose CAD software that requires several weeks of training and costs $250+/month. Fabrik is a specialized evacuation plan software: no training required, natively ISO 7010 compliant, with plan import as a background layer and line-level tracing tools (automatic snapping). A plan takes just a few minutes to create versus 3 to 5 hours on AutoCAD.
Can I export my plans in high-resolution PDF?
Yes, once the export is paid for. The free plan is for testing the editor: you preview your plan on screen (with a Fabrik watermark), no download. To export the high-resolution PDF (up to 300 dpi, A4 to A0) without watermark — ready for printing or the safety commission — pay €19.99 once for the building, or subscribe.
How long does it take to create an evacuation plan?
With Fabrik's plan import and line-level tracing tools, expect under 15 minutes for a complete plan of a 5th category ERP. For more complex buildings (multiple floors, multi-buildings), expect 30 to 60 minutes.
Does Fabrik work on Mac and mobile?
Fabrik is a 100% web application: it works on all recent browsers (Chrome, Firefox, Safari, Edge) on Mac, Windows or Linux. A tablet version is available for viewing. Editing is optimized for desktop.
Can I collaborate with my team on the same plan?
Yes, with the subscription: invite colleagues with a role (administrator, editor or viewer). Plans are shared within the team, with version history so you can restore a previous version.
What happens if the ISO standards change?
The Fabrik team updates the pictogram library and templates as the standards evolve. Your existing plans remain editable so you can apply these changes.
What are the employer's obligations regarding evacuation plans?
Article R4227-38 of the French Labour Code requires every establishment employing more than 5 people to set up an evacuation and intervention plan, posted on every floor and near access points. Article R4227-37 also makes posting the general fire safety instructions mandatory. Failure to comply is sanctionable by labour inspection and can lead to criminal liability of the head of establishment in the event of an accident. Fabrik produces all of these deliverables (ISO 23601 / NF X08-070 compliant evacuation plan, firefighter intervention plan, general instructions) in a single environment.
What is the difference between ISO 23601, NF X08-070 and APSAD R4?
ISO 23601 is the international standard that defines the graphic design of evacuation plans for the public (symbols, scale, 'You are here' marker). NF X08-070 is the French standard detailing the presentation rules for fire safety plans (evacuation + intervention) and specifies the ISO 7010 colours and pictograms to be used. APSAD R4 is a CNPP reference that governs the location and maintenance of portable fire extinguishers — it is the basis for correctly placing extinguisher pictograms on the intervention plan. Fabrik natively integrates these three references.
Ready to create your evacuation plans in just a few minutes?
Join nearly 1,000 fire safety professionals who trust Fabrik.
