Safety Commission Checklist
The safety commission visit determines the opening and continued operation of your French ERP (public-access establishment). This checklist covers the 10 points checked, preparation timeline, visit walkthrough and types of opinions. All regulatory references cited.
What is a safety commission?
The safety commission against fire and panic risks is a French departmental or municipal advisory commission created by decree no. 95-260 of 8 March 1995. It visits Public-Access Establishments (ERP) to verify compliance with the fire safety rules defined by the order of 25 June 1980 and the French Construction Code. Its visit is mandatory before opening a new ERP, after building modifications, and periodically depending on the establishment's category (1, 2, 3 or 5 years). Its visit results in an opinion that may be favorable, favorable with prescriptions, or unfavorable — in which case the establishment may be closed.
10 points to verify before the commission
1ISO 7010 and NF X08-070 compliant evacuation plans
The evacuation plan is the most visible element and the first checked. It must be present at every level, near each exit, and properly oriented.
- ISO 7010 compliance (pictograms) and ISO 23601 / NF X08-070 (presentation)
- "You are here" indicator clearly shown on each plan
- Scale, legend and emergency numbers (18, 112) included
- Plan up to date: redo if premises were reorganized since last plan
- Minimum A3 format in ERP categories 1-4, A4 acceptable in category 5
2Up-to-date safety register
Mandatory document (article R. 143-44 of the Construction Code) recording all fire-safety related events.
- Annual technical inspections: extinguishers, alarm, smoke control, emergency lighting, hose reels
- Evacuation drill reports (semi-annual minimum)
- Hot work permits for all welding/grinding/etc. tasks
- Previous commission visits and lift of prescriptions
- Available immediately, paper or digital with guaranteed access
3Organized and recorded evacuation drills
The French Labor Code (article R. 4227-39) requires at minimum 1 drill every 6 months. ERPs may have stricter frequency by type.
- At minimum 2 drills per year, roughly 6 months apart
- Varied scenarios: fire start, smoke, blocked exit, alarm failure
- Structured debrief with weak-point analysis
- Date, duration, scenario, participants and observations recorded
- Schools: quarterly drill mandatory (order of 13 January 2004)
4Verified safety equipment
All firefighting equipment must have been verified within regulatory deadlines by an accredited body, with report.
- Extinguishers: annual inspection (NF S 61-919), 1 per 200 m² minimum
- Fire Safety System (SSI): semi-annual or annual inspection by category
- Emergency lighting (BAES): weekly visual + annual technical check
- Smoke control: annual inspection of vents and air intakes
- Electrical installation: annual Q18 or triennial Q19 by risk
- All reports and certificates filed and accessible in the register
5Clear and signposted emergency exits
First point physically checked by inspectors: they open doors, verify distances and obstacles.
- Minimum width: 0.90 m for 1 passage unit, 1.40 m for 2
- No storage, furniture or decoration blocking the path
- Functional fire doors with self-closer (alarm-triggered if present)
- Illuminated "EXIT" signage visible and powered
- Maximum distance between 2 exits: 50 m (40 m for dead-end, art. CO 38)
6Posted and legible safety instructions
General and specific instructions must be posted near evacuation plans at every level.
- General evacuation instruction (who does what when alarm sounds)
- Specific instructions: fire, gas, injury response
- Emergency numbers in large print (18 fire, 15 SAMU, 112 European)
- Intervention plan for firefighters stored at reception or lobby
- Instructions translated if hosting foreign public (hotels, stations)
7Up-to-date staff training
Every employee must have received fire safety training appropriate to their role; specific actors must be trained and qualified.
- Initial fire training for every new employee (R. 4141-3-1 Labor Code)
- Extinguisher handling training at least every 5 years
- First-Intervention Team Members (EPI): 1 per 10-15 employees recommended
- SSIAP 1, 2 or 3 for ERP categories 1, 2 or IGH
- Training certificates kept in the safety register
8Available technical documentation
All technical documents must be immediately accessible to the commission.
- Safety notice (building description, occupants, response means)
- Architectural plans of premises (initial visit)
- Previous commission report with prescriptions lifted
- Layout opinions, ERP work authorizations
- Technical inspection reports (RVRAT, RVRMD)
9Periodic inspections performed
Beyond equipment, certain installations and parts of the building have their own inspection cadence.
- Elevators: annual + complete check every 5 years
- Automatic doors: quarterly
- Kitchens with professional hoods: quarterly duct cleaning
- Gas installations: annual by accredited body
- Lightning rods if present: annual + complete check every 5 years
10Compliance with current ERP standards
Specific obligations depend on category (1-5) and type of ERP (M, N, O, P, R, U, J, etc.).
- Category correctly declared per total occupancy (public + staff)
- ERP type correctly declared: M (retail), N (restaurant), O (hotel), R (school), U (healthcare), etc.
- Layout changes (partitions, mezzanines) authorized
- Compliance with type-specific provisions (order of 25 June 1980)
- If IGH (high-rise): reinforced IGH compliance
Preparation timeline: D-30 → D-day
A commission cannot be prepared the day before. Reference timeline for serene anticipation.
D-30: complete internal audit
Walk through the building with the checklist. Identify gaps. Prioritize corrections by risk (safety > documentation). Order missing technical inspections.
D-15: gap closure
All technical inspections complete and received. Evacuation plans updated and printed. Instructions posted. Register updated. Evacuation drill conducted if last one over 3 months ago.
D-7: team briefing
Gather staff, recall instructions, designate the person welcoming the commission. Prepare a physical dossier with all supporting documents. Verify SSIAP or safety lead presence on D-day.
D-1: final check
Quick walk-through: all emergency lights on? All exits clear? All pictograms in place? All extinguishers correctly positioned? Register near reception with all annexes.
D-day: typical walkthrough
Welcome of the commission (1-3 people: fire prevention officer, elected official, technician). Building presentation, physical walkthrough, document check, observations. Average duration 1-3 hours by category. Opinion delivered verbally at end of visit, written report sent within 2-4 weeks.
The 3 types of opinions and their consequences
Favorable opinion
The establishment may open or continue operating without modification. Next visit will follow the category periodicity (1 year for category 1, 2 years for category 2, etc.).
Favorable with prescriptions
The establishment may open, but must lift prescriptions within a stipulated timeframe (typically 2-6 months by severity). A control visit may be scheduled. Prescriptions must be recorded in the register.
Unfavorable opinion
The establishment cannot open or must close pending compliance. The mayor or prefect may issue a closure order. Common reasons: missing compliant evacuation plan, unverified safety equipment, blocked exits, missing training, serious register gaps.
Visit periodicity by category
- Category 1 (over 1,500 people): annual visit
- Category 2 (701 to 1,500): every 2 years
- Category 3 (301 to 700): every 3 years
- Category 4 (under 300, excl. 5th cat.): every 5 years
- Category 5 (small ERP with sleeping accommodations or specific public): visit at opening then on demand
- IGH (high-rise): every 2 years systematically
- Establishments with accommodation (hotels, hospitals): reinforced periodicity
Create commission-ready compliant plans
With Fabrik, create evacuation plans compliant with ISO 7010, ISO 23601 and NF X08-070 that pass the safety commission without reservations. Certified pictogram library, auto-generated legend, high-resolution PDF export.
Create a compliant plan⚡ free Discovery plan, no cardFrequently asked questions
Prepare your safety commission visit with confidence
ISO 7010 compliant plans • D-30 → D-1 timeline • free Discovery plan